BREANNA SCANLON
MECHANICAL
Advisor: Dr. Donghyun Rim
WOODCREST VILLA
VIVA CENTRE
LANCASTER, PA
AETHESIS

THE CAPSTONE PROJECT ELECTRONIC PORTFOLIO (CPEP) IS A WEB-BASED PROJECT AND INFORMATION CENTER. IT CONTAINS MATERIAL PRODUCED FOR A YEAR-LONG SENIOR THESIS CLASS. ITS PURPOSE, IN ADDITION TO PROVIDING CENTRAL STORAGE OF INDIVIDUAL ASSIGNMENTS, IS TO FOSTER COMMUNICATION AND COLLABORATION BETWEEN STUDENT, FACULTY CONSULT, COURSE INSTRUCTORS, AND INDUSTRY CONSULTANTS. THIS WEBSITE IS DEDICATED TO THE RESEARCH AND ANALYSIS CONDUCTED VIA GUIDELINES PROVIDED BY THE DEPARTMENT OF ARCHITECTURAL ENGINEERING. FOR AN EXPLANATION OF THIS CAPSTONE DESIGN COURSE AND ITS REQUIREMENTS CLICK HERE.




Woodcrest Villa VIVA Centre is composed of 2 areas, the Wellness Center and Community Center.
Within this elegant VIVA Centre, the campus community is offered with several amenities. These amenities include:
- Indoor Pool
- Spa & Beauty Salon
- Movie Theater
- Multi-Purpose Auditorium
- Cardio Room
- Several others
NEWSFEED:
APRIL 20, 2018 | FINALIZED CPEP & CHECKLIST: REVIEW READY
APRIL 20, 2018 | ABET ANALYSIS
APRIL 6, 2018 | FINAL REPORT SUBMITTED TO FINAL REPORT PAGE
MARCH 28, 2018 | SUBMITTED PPT OUTLINE DRAFT
JANUARY 18, 2018 | SUBMITTED PROPOSAL
JANUARY 18, 2018 | SUBMITTED SCHEDULE
DECEMBER 4, 2017 | FINAL CPEP REVIEW
DECEMBER 4, 2017 | SUBMITTED FINAL PROPOSAL
NOVEMBER 27, 2017 | SUBMITTED BREADTH TOPIC PROPOSALS
NOVEMBER 17, 2017 | SUBMITTED TECHNICAL REPORT 3
OCTOBER 23, 2017 | SUBMITTED ABSTRACT TO CPEP
OCTOBER 20, 2017 | SUBMITTED TECHNICAL REPORT 2
OCTOBER 19, 2017 | SUBMITTED FINAL BUILDING STATISTICS
OCTOBER 2, 2017 | SUBMITTED BUILDING STATISTICS PT. 1
SEPTEMBER 22, 2017 | SUBMITTED ABSTRACT
SEPTEMBER 28, 2017 | MET WITH PROFESSOR RIM
SEPTEMBER 22, 2017 | SUBMITTED TECHNICAL REPORT 1
SEPTEMBER 19, 2017 | ATTENDED AE CAREER FAIR
SEPTEMBER 18, 2017 | HOSTED SYSKA HENNESSY GROUP
SEPTEMBER 15, 2017 | STUDENT BIO-SKETCH/ PEER REVIEW
SEPTEMBER 13, 2017 | MET WITH PROFESSOR RIM
SEPTEMBER 11, 2017 | ATTENDED DR. DOUGHERTY PRESETATION
SEPTEMBER 11, 2017 | CPEP FULL MENU FUNCTIONALITY
SEPTEMBER 5, 2017 | CPEP HOME PAGE DRAFT
SEPTEMBER 1, 2017 | BUILDING STATISTICS PT.1
SEPTEMBER 1, 2017 | CONFIRMED MASTER LIST INFO
AUGUST 31, 2017 | ATTENDED CPEP SEMINAR
AUGUST 28, 2017 | OBTAINED CD'S
AUGUST 24, 2017 |THANK YOU NOTES SENT
AUGUST 23, 2017 | PROJECT CHECKLIST PT. 1
AUGUST 18, 2017 | OWNER PERMISSION FORM RECEIVED