Executive Summary:

            This report summarizes and concludes the previous two semesters worth of research, design, and analysis of Woodcrest Villa’s mechanical system. The goal for this thesis was to learn as much as possible while applying research and critical thinking to design a new mechanical system or alteration for the existing system. The past three technical reports analyzed the building system compliances, design criteria, and an understanding of the existing mechanical system which led to this final report of proposing an alternative system.

 

            The process began with analyzing the building’s design and organizing this information to use for an energy analysis. ASHRAE Standards has several requirements that certain building types have to comply with. ASHRAE Standards 62.1 and ASHRAE Standards 90.1 were used to make sure Woodcrest Villa’s VIVA Centre was compliant with ventilation requirements for acceptable indoor air quality and energy standards.

 

            A computer energy analysis was used to obtain data and simulation results for Woodcrest. Carrier’s Hourly Analysis Program, HAP, was the computer energy simulator that was used for the building’s mechanical system analysis. This program allows the user to input several specific building design aspects, which results with more accurate results. Architectural components for the VIVA Centre such as the building envelope, orientation, location, space functions, occupancy, lighting, equipment, and other design criteria was input into the energy simulation model.  These results broke down the buildings heating and cooling loads, mechanical equipment, and energy analysis. This all lead to having enough information and understanding of the existing mechanical system that serves the VIVA Centre, and being able to propose a new mechanical depth.

 

            The existing mechanical system combines several aspects of mechanical designs which are used for areas for similar and different load treating needs. The system is a water loop heat pump system with reheat. It utilizes a central boiler heating plant that serve multiple water source heat pumps, air handlers, and also treats the domestic water loop. The cooling system is built into the mechanical air handlers, therefore there is no central cooling plant.

 

            The proposed mechanical alteration is to add a single central cooling plant to serve Villas loads in place of several water source heat pumps. Reduction of fuel oil and heating electrical usage was a main goal with redesigning the mechanical system. The proposed redesigned mechanical system proved to not be an ideal alternative. The annual cost is higher, the equipment material increases, and the electrical costs increased.

FINAL REPORT:

EXECUTIVE SUMMARY:

NEWSFEED:

APRIL 20, 2018 | FINALIZED CPEP & CHECKLIST: REVIEW READY

APRIL 20, 2018 | ABET ANALYSIS

APRIL 6, 2018 | FINAL REPORT SUBMITTED TO FINAL REPORT PAGE

MARCH 28, 2018 | SUBMITTED PPT OUTLINE DRAFT

JANUARY 18, 2018 | SUBMITTED PROPOSAL

JANUARY 18, 2018 | SUBMITTED SCHEDULE

DECEMBER 4, 2017 | FINAL CPEP REVIEW

DECEMBER 4, 2017 | SUBMITTED FINAL PROPOSAL 

NOVEMBER 27, 2017 | SUBMITTED BREADTH TOPIC PROPOSALS

NOVEMBER 17, 2017 | SUBMITTED TECHNICAL REPORT 3 

OCTOBER 23, 2017 | SUBMITTED ABSTRACT TO CPEP

OCTOBER 20, 2017 | SUBMITTED TECHNICAL REPORT 2

OCTOBER 19, 2017 | SUBMITTED FINAL BUILDING STATISTICS

OCTOBER 2, 2017 | SUBMITTED BUILDING STATISTICS PT. 1

SEPTEMBER 22, 2017 | SUBMITTED ABSTRACT

SEPTEMBER 28, 2017 | MET WITH PROFESSOR RIM 

SEPTEMBER 22, 2017 | SUBMITTED TECHNICAL REPORT 1

SEPTEMBER 19, 2017 | ATTENDED AE CAREER FAIR

SEPTEMBER 18, 2017 | HOSTED SYSKA HENNESSY GROUP

SEPTEMBER 15, 2017 | STUDENT BIO-SKETCH/ PEER REVIEW

SEPTEMBER 13, 2017 | MET WITH PROFESSOR RIM

SEPTEMBER 11, 2017 | ATTENDED DR. DOUGHERTY PRESETATION

SEPTEMBER 11, 2017 | CPEP FULL MENU FUNCTIONALITY

SEPTEMBER 5, 2017  | CPEP HOME PAGE DRAFT

SEPTEMBER 1, 2017 | BUILDING STATISTICS PT.1 

SEPTEMBER 1, 2017 | CONFIRMED MASTER LIST INFO

AUGUST 31, 2017 | ATTENDED CPEP SEMINAR

AUGUST 28, 2017 | OBTAINED CD'S

AUGUST 24, 2017 |THANK YOU NOTES SENT

AUGUST 23, 2017 | PROJECT CHECKLIST PT. 1

AUGUST 18, 2017 | OWNER PERMISSION FORM RECEIVED

bottom of page