Mechanical Depth

Chiller Plant:

The new designed system will utilize a chiller plant to service air handling units and fan coil units. This will incorporate a 4-pipe system to provide both heating and cooling simulatneously

Acoustical Breadth

With the use of a 4 pipe chiller and boiler system serving several fan coil units, the spaces located near this equipment should not be affected by the sound. The noise criteria requirements and equipment design will be analyzed

Electrical/ Lighting Breadth

Replace existing fixtures that consume a significant amount of energy with lower wattage consuming and energy saving fixtures

NEWSFEED:

APRIL 20, 2018 | FINALIZED CPEP & CHECKLIST: REVIEW READY

APRIL 20, 2018 | ABET ANALYSIS

APRIL 6, 2018 | FINAL REPORT SUBMITTED TO FINAL REPORT PAGE

MARCH 28, 2018 | SUBMITTED PPT OUTLINE DRAFT

JANUARY 18, 2018 | SUBMITTED PROPOSAL

JANUARY 18, 2018 | SUBMITTED SCHEDULE

DECEMBER 4, 2017 | FINAL CPEP REVIEW

DECEMBER 4, 2017 | SUBMITTED FINAL PROPOSAL 

NOVEMBER 27, 2017 | SUBMITTED BREADTH TOPIC PROPOSALS

NOVEMBER 17, 2017 | SUBMITTED TECHNICAL REPORT 3 

OCTOBER 23, 2017 | SUBMITTED ABSTRACT TO CPEP

OCTOBER 20, 2017 | SUBMITTED TECHNICAL REPORT 2

OCTOBER 19, 2017 | SUBMITTED FINAL BUILDING STATISTICS

OCTOBER 2, 2017 | SUBMITTED BUILDING STATISTICS PT. 1

SEPTEMBER 22, 2017 | SUBMITTED ABSTRACT

SEPTEMBER 28, 2017 | MET WITH PROFESSOR RIM 

SEPTEMBER 22, 2017 | SUBMITTED TECHNICAL REPORT 1

SEPTEMBER 19, 2017 | ATTENDED AE CAREER FAIR

SEPTEMBER 18, 2017 | HOSTED SYSKA HENNESSY GROUP

SEPTEMBER 15, 2017 | STUDENT BIO-SKETCH/ PEER REVIEW

SEPTEMBER 13, 2017 | MET WITH PROFESSOR RIM

SEPTEMBER 11, 2017 | ATTENDED DR. DOUGHERTY PRESETATION

SEPTEMBER 11, 2017 | CPEP FULL MENU FUNCTIONALITY

SEPTEMBER 5, 2017  | CPEP HOME PAGE DRAFT

SEPTEMBER 1, 2017 | BUILDING STATISTICS PT.1 

SEPTEMBER 1, 2017 | CONFIRMED MASTER LIST INFO

AUGUST 31, 2017 | ATTENDED CPEP SEMINAR

AUGUST 28, 2017 | OBTAINED CD'S

AUGUST 24, 2017 |THANK YOU NOTES SENT

AUGUST 23, 2017 | PROJECT CHECKLIST PT. 1

AUGUST 18, 2017 | OWNER PERMISSION FORM RECEIVED

bottom of page